Current Street Construction
SE Wax Road/180th Avenue SE Widening Project (CIP#1033)
PUBLIC WORKS PROJECT
This project will widen the roadway from approximately 300 feet north of the SR 516/Wax Road intersection to SR 18. The project will construct one new traffic lane for left turns, and will add a five leg roundabout at the intersections with SE 267th Street, 180th Avenue SE and SE Wax Road. The project will construct new bicycle lanes on both sides and separated 8-foot wide sidewalks and street illumination to meet the arterial design standards adopted by Covington. Construction is planned to begin in late fall of 2007, subject to right-of-way acquisition.

Contact:Brian Sourwine, Project Manager
Phone:206.284.0860
E-mail:bsourwine@g-o.com


SE 256th Street/164th Avenue SE, 168th Avenue SE and High School Intersection Project (CIP #1034)
PUBLIC WORKS PROJECT
This project will widen SE 256th Street from 160th Avenue SE to east of the intersection of 168th Avenue SE to five lanes, bike lanes, access control/left turn lane control, planter stripes, 8-foot wide arterial sidewalks and street lighting. The project also includes a segment of 164th Avenue SE from SE 256th Street to SE 267th Street. This segment of 164th Avenue SE will be three lanes with access control, signal replacement at 256th/164th with a two lane roundabout and a new signal at the entrance to Kentwood High School, 168th/256th and 156th/256th.

Schedule:Construction which began in late 2005 is expected to be completed in early 2008.
Contact:Brian Sourwine, Project Manager
Phone:206.284.0860
E-mail:bsourwine@g-o.com


164th Avenue SE Pedestrian Safety Project Phase II (CIP #1038)
PUBLIC WORKS PROJECT
This project is tied to the time lines listed above for the SE 256th Street/164th Avenue SE project with widening on the east side of the street for left turn lane, bike lane, storm drainage, planter strip, 8-foot wide sidewalk and street lights.

Schedule:Construction which began in late 2005 is expected to be completed in early 2008.
Contact:Tani Stafford, Project Manager
Phone:206.284.0860
E-mail:tstafford@g-o.com


SR 516 Access Control and Wax Road Intersection Project (CIP #1039)
PUBLIC WORKS PROJECT
The goal of this project is to improve pedestrian and motorist safety and improve operational conditions within the SR 516 corridor between Wax Road SE and 800 feet, approximately, west of the Jenkins Creek Crossing, and to improve street lighting, traffic signal operations and reduce accidents.

Schedule:Construction is expected to be completed in early 2008.
Contact:Samuel Richard, Project Manager
Phone:425.951.4860
E-mail:sjrichard@whpacific.com


Current Stormwater Construction
Current Private / Public Development
168th Avenue SE Extension Project (CIP #1030, 1082, 1084, 1085)
PRIVATE / PUBLIC DEVELOPMENT
Through a developer agreement between the City of Covington and BranBar, LLC, an extension of the 168th Avenue corroder has received preliminary design as to alternative routes for the roadway, connection of SR 516 to Covington Way with a future road extension between this roadway and Wax Road. The purpose of this roadway is the transfer of trips from SR 516 and to improve access to future development projects south of Safeway and Fred Meyer. This will be a three lane arterial with two roundabouts to control traffic movements at the intersections and a signal at Covington Way. Projected construction start is mid to late 2007 with completion in 15 to 18 months.

This project will also provide a controlled access to the BPA property west of the substation and will change Covington Firs access away from the heavily traveled Covington Way to the south roundabout.

Schedule:Construction from 2007 - 2008.
Contact:Brian Sourwine, Project Manager
Phone:206.284.0860
E-mail:bsourwine@g-o.com


Departments
Executive
   Department
Community
   Development
Finance Department
Parks & Recreation
Police Department
Public Works
   Staff
   Emergency
      Management
Engineering
      Division
Current Projects
      Design &
          Construction
          Standards
      Traffic Counts
      Utility Contact Info
   Operations &
      Maintenance
      Division
   Surface Water
      Management

United States Flag 16720 SE 271st Street,  Suite 100, Covington WA, 98042 - (253) 638-1110
© 2010 City of Covington  •   Designed by Dungeness Communications, Inc.  •   Disclaimer
Washington State Flag